Running out of concrete halfway through a pour is one of the worst moments in a DIY project. A joint between two batches is weak and shows, and the first batch won't wait for you. Ordering far too much wastes money and leaves you with a heavy disposal problem. The calculation itself takes a minute, and most mistakes come from mixing units.
The basic formula
For anything rectangular:
Volume = length × width × thickness
All three numbers must use the same unit. The classic error is multiplying feet by feet by inches. Convert the thickness first: 4 inches is 0.33 feet, and 100 mm is 0.1 meters.
Metric example. A shed base of 5 m × 4 m, 100 mm thick:
5 × 4 × 0.1 = 2 m³
Imperial example. A patio of 20 ft × 12 ft, 4 inches thick:
20 × 12 × 0.33 = 80 cubic feet, and 80 ÷ 27 = about 3 cubic yards
The concrete calculator takes the dimensions in either system and does this for slabs, strip footings, columns and steps.
Round columns and post holes
For round shapes, use the area of a circle:
Volume = π × radius² × height
Remember that the radius is half the diameter. A column 30 cm across and 2.4 m tall has a radius of 0.15 m:
3.14 × 0.15 × 0.15 × 2.4 = about 0.17 m³
Multiply by the number of posts. Post holes are rarely clean cylinders, and they tend to widen near the top, so measure a typical hole rather than trusting the auger size. For unusual shapes, split the job into simple parts or use the volume calculator.
Steps
Solid steps are easy to underestimate. Each step is a block that runs from the ground up to its own tread, so the lower steps contain far more concrete than they appear to. Work out each step on its own:
Step volume = width × tread depth × height of that step above the ground
Add the results together. A top landing is simply one more, deeper block.
How much extra to add
The result of the formula is the theoretical volume. The real one is almost always higher:
- The ground is never flat. On a 100 mm slab, 10 mm of extra depth across the area adds 10% more concrete.
- Forms bow under the weight of wet concrete.
- Some is lost in the mixer, in the wheelbarrow and on the ground.
Add 5% for a well-prepared, level base and 10% for rough ground or for your first pour. For post holes dug by hand, 10% is sensible too.
Bags or ready-mix?
Premixed bags suit small jobs. How many you need depends on the yield, which is printed on the bag. These are typical figures:
| Bag size | Approximate yield |
|---|---|
| 40 lb | 0.30 cubic feet |
| 60 lb | 0.45 cubic feet |
| 80 lb | 0.60 cubic feet |
The patio above needs 80 cubic feet, plus 10% makes 88. At 0.6 cubic feet per bag, that is 147 bags of 80 lb each, nearly 12,000 pounds to lift, mix and place. For a job of that size, ready-mix from a truck is usually cheaper and much kinder to your back.
As a rough guide, bags work well up to about half a cubic meter. Beyond that, ask a ready-mix supplier for a quote, and ask about their minimum order and any short-load fee. Suppliers usually sell in steps such as quarter units, so round up rather than down. Check before the day whether the truck can reach the site, too. A long way from the road may mean a concrete pump or many wheelbarrow trips.
Mixing it yourself
If you mix from raw materials, a common ratio for general work is 1 part cement, 2 parts sand and 3 parts gravel by volume. Add water gradually until the mix holds its shape without being soupy. Too much water makes concrete easier to place but weaker once it has cured.
The volume of the ingredients adds up to more than the volume of the finished concrete, because the sand and cement fill the gaps between the stones. Don't simply divide your volume by six to find each ingredient. The concrete calculator accounts for this and lists cement, sand, gravel and water for the ratio you choose.
Don't forget what goes under the slab. A compacted layer of crushed stone gives the concrete a stable base, and the gravel calculator works out how much you need.
Common thickness guidelines
Thickness has more effect on cost than anything else, and on strength too. These are common starting points, not engineering advice:
- Paths and patios: about 100 mm (4 inches)
- Driveways for cars: about 125–150 mm (5–6 inches)
- Shed bases: about 75–100 mm (3–4 inches), depending on the load
Local building codes, soil conditions and frost depth can all change the right answer. For anything structural, such as foundations or retaining walls, ask a qualified engineer or your local building department.
Weight matters too
Placed concrete weighs about 2,400 kg per cubic meter (around 4,000 pounds per cubic yard). Two cubic meters is close to five tonnes. Keep that in mind before you park a loaded truck on a soft driveway, or if you plan a slab on a raised structure.